Success Stories: World-Class Operations



Lower lead Times = Lower Costs and Higher Profits

The Situation

Granite Bay was called in to solve the problem of long lead times and a huge work backload at a low volume, high-variety manufacturer of home furnishings. Lead times were running at 14 weeks and expanding. Work-in-process inventory was 12 percent of sales and was creating problems with both cash flow and shop floor organization. With raw materials being shipped from overseas, lead times were measured in weeks, with materials shipped in large quantities to reduce transportation costs.

The factory flow was that of a labor-intensive job shop, where each order was custom-made. There were few performance measures in place, with no data on first-pass quality, equipment reliability or on-time shipments. And the things that were measured weren’t shared with the shop floor.

The Solution

Because of the labor-intensiveness of the work, it was essential to engage employees in the process of improving the operation. We quickly realized that the list of improvements required to bring this factory to world-class standards would be enormous. We had to articulate a compelling vision and a common-sense strategy that would yield the improvements needed while bringing employees on board as eager participants.

The focal point became Lead Time Reduction. It was the single objective that tied all of the other performance goals together, and it was something every employee could personally relate to. Overall manufacturing lead time could be broken down into its components by area along the process route. Each team could analyze its own lead time component and identify innovative ways to squeeze time out of the process while making their jobs easier, safer and more enjoyable.

The Results

Many smaller initiatives stemmed from this lead time reduction effort, including built-in quality, 5S, pull manufacturing and team problem-solving. Within 6 months, manufacturing lead times were reduced by 55% (73% within a year). First-pass quality defects were reduced by 72%. And employees developed a greater sense of ownership and had more confidence in their ability to drive future performance improvements.

More Successes


We'd like to add your plant to our Success Stories!

If you need faster improvement, more engagement and a plant-wide focus on business objectives, we'd love to hear from you!

Contact us or submit a brief questionnaire describing your challenges and we'll be happy to discuss your situation and suggest some solutions, free of charge.


GRANITE BAY GLOBAL - 916-797-2263 - email
P.O. Box 2514, Granite Bay, California 95746 USA

The material on this web site is copyright ©1997-2012 by Granite Bay Global, Inc.